Manufacturing

Manufacturing automation

Materials and stock tracking, electronic logs, health and safety documentation and task control for manufacturing plants.

What people come to us with

Materials are tracked in spreadsheets and stock doesn't match reality

Goods in, goods out and current stock in one database with change history and access rights.

Logs are kept on paper — before an inspection we hunt for the right one for hours

Electronic logs with signatures: a document comes up in seconds and can't be lost.

Tasks get lost between meetings

Every task has a deadline and an owner, and overdue items show on the manager's dashboard.

Safety briefings are a formality, but we're held to them for real

A briefing history for every employee, with dangerous situations practised in a VR simulator.

Manufacturing is where we've deployed the most systems. The pattern is almost always the same: processes have been refined over years but live on paper and in spreadsheets, so management sees the picture several days late.

What moves into the system

ProcessWhat the system gives you
Materials and stock trackingOne database, analytics by warehouse, Excel export
Shift reports, permits, inspection recordsElectronic logs with history and search
Health and safety briefingsSignatures, history, clear view of who has been briefed
Training for hazardous workA VR simulator instead of a paper instruction
Management tasksDeadlines, owners, statuses, an overdue dashboard

Why rollouts stall

The most common reason a rollout fails isn't the code — it's people: a system staff can't or won't use doesn't work, however well it's built. So we design the interface around real shift scenarios, build training into the project and allow a period of running alongside the old method.

Integrating with what's already there

We connect the system to 1C, accounting software and equipment — scanners, scales, biometric terminals. The difficulty depends on whether an exchange interface exists; that's established during the review, before development starts.

Frequently asked questions

From 1 500 000 ₸ for a system covering one process. Complex projects with several modules and integrations start at 5 000 000 ₸. The initial review is free.

From 1.5 months for a single process. A project with several modules and a 1C integration takes from 4 months.

Yes, that's a common part of the project. The equipment set and exchange method are decided during the review.

That's the main reason rollouts fail. We build in training, instructions in plain language and a period of running alongside the old method.

It depends on the document type and what inspectors require. Some logs are kept electronically with signatures, others are duplicated on paper by regulation — we work this out before starting.
Contact

Let's discuss your task

Tell us what you want to build — and we'll suggest how to make it happen.

LocationWorking remotely worldwide
Quick responseWe usually respond within 2-4 hours during business hours.
Request

Tell us about your task

By submitting the form you agree to the processing of your personal data.